A Multi-objective Resource-constrained Project Scheduling Problem Using Genetic Algorithm
dc.contributor.author | Ogunwolu, L. | |
dc.contributor.author | Sosimi, A.A. | |
dc.contributor.author | Salahudeen, T. | |
dc.date.accessioned | 2022-08-30T20:11:39Z | |
dc.date.available | 2022-08-30T20:11:39Z | |
dc.date.issued | 2018 | |
dc.description.abstract | Resource-Constrained Project Scheduling Problem (RCPSP) has been modeled as a single or multi-objectives, using minimization of project make-span, lateness, total weighted start time, total project cost and maximization of project net present value. In this paper, a multi-objective RCPSP incorporated resource idleness into the list of RCPSP objectives. Here, the RCPSP is modeled as a Mixed Integer Non-Linear Programme to depict the various objective factors namely cost, time and resource idleness. Genetic algorithm (GA) meta-heuristic solution technique is used to promote solution diversity and determine the Pareto optimal for the multi-objective problem. The performance of the proposed RCPSP model was evaluated using a standard test problem that consist of 5 activities, 3 reusable resource types and a network diagram; a comprehensive computational experiment was performed and the results were analyzed with precedence relations considering the objectives as single objectives, bi-objectives and in combined form as multi-objectives simultaneously. The integration of resources idleness into the multi-objective policy gives more realistic result. | en_US |
dc.identifier.citation | OGUNWOLU, L., Sosimi, A., & Salahudeen, T. (2018). A Multi-Objective Resource-Constrained Project Scheduling Problem Using Genetic Algorithm. FUTA Journal of Engineering and Engineering Technology, 12(1), 90-101. | en_US |
dc.identifier.uri | https://ir.unilag.edu.ng/handle/123456789/11135 | |
dc.language.iso | en | en_US |
dc.subject | Multi-Objective, Resource-Constrained, Project Scheduling Problem, Genetic Algorithm, Precedence Relations | en_US |
dc.title | A Multi-objective Resource-constrained Project Scheduling Problem Using Genetic Algorithm | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 08L Multi Objective Resource Constrained Scheduling-2-9.pdf
- Size:
- 2.33 MB
- Format:
- Adobe Portable Document Format
- Description:
- Full Paper
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: