Assessment of Risks Associated with The Procurement of Facilities Management Services in Nigeria.

dc.contributor.authorFaremi, J.O
dc.contributor.authorAdenuga, O.A
dc.contributor.authorBeauty, J.I
dc.contributor.authorAkinbode, A.T
dc.date.accessioned2016-06-18T19:56:59Z
dc.date.available2016-06-18T19:56:59Z
dc.date.issued2014-01-28
dc.descriptionConference Paperen_US
dc.description.abstractFacilities management (FM) services can be managed in-house, outsourced or partly in house and partly outsourced (Hybrid). Each of the FM procurement options possesses inherent risks of grave consequences. This study aim at assessing risks inherent in each of the procurement options for FM services. A structured questionnaire was used as the principal instrument for this study. 75 copies of structured questionnaires were distributed, 55 were completed and returned representing 73% response rate. Data for the study was processed and analysed using SPSS for both descriptive and inferential statistics. The analysis revealed risks with the highest level of potential occurrence in in-sourcing FM services as low labour productivity, overstaffing and poor accountability. While, threat to data security, loss of management controls and poor motivation are major risks in outsourcing FM services. This studv concludes that poor accountability and loll' labour productivity are major risk factors that cuts across all FM procurement routes that is capable of affecting employees' relationship and passion for work. Performance reward and regular account reconciliation are therefore recommended since this can either reinforce an outsourcing relationship or enhance an in-house retaining of FM services.en_US
dc.identifier.citationFaremi, J.O, Et...al (2014) Assessment of Risks Associated with The Procurement of Facilities Management Services in Nigeria. Proceedings of the CIB W107 2014 International Conference, Lagos.en_US
dc.identifier.urihttp://ir.unilag.edu.ng:8080/xmlui/handle/123456789/797
dc.language.isoenen_US
dc.subjectProcurement Optionsen_US
dc.subjectRisksen_US
dc.titleAssessment of Risks Associated with The Procurement of Facilities Management Services in Nigeria.en_US
dc.typePresentationen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ASSEESSMENT OF RISKS ASSOCIATED WITH THE PROCUREMENT OF FACILITIES MANAGEMENT SERVICES IN NIGERIA.pdf
Size:
7.15 MB
Format:
Adobe Portable Document Format
Description:
Full Paper
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: