An Investigation of Time-Cost-Risk Trade-off in the Installation of X-ray Machine

No Thumbnail Available
Date
2014-10-01
Authors
Nwaneri, S.C
Anya, C.O
Journal Title
Journal ISSN
Volume Title
Publisher
Faculty of Engineering, University of Nigeria, Nsukka,
Abstract
The conflicting objectives of time, cost and risk are critical to the success of any project. Consequently, an improvement in one objective may lead to a simultaneous degradation of the conflicting objective. Project managers usually desire the minimization of the duration, cost and risk of a project while maximizing project quality. While the Time-Cost trade-off problem (TCTP) and the Time-Cost-Quality trade-off problem (TCQTP) have been well researched, not much studies have been done on the Time-Cost-Risk (TCRTP). The objective of this study is to develop a TCRTP based on some realistic assumptions with the aim of minimizing time, cost, quality and risk while ensuring that the project is completed based on specifications. Optimization models were developed for the problem and solved using response surface methodology on minitab 16 statistical software. The model was applied to the installation procedures for X-ray machines.
Description
Staff publications
Keywords
Time , Cost , Risk , X-ray machines , Research Subject Categories::TECHNOLOGY::Other technology
Citation
Nwaneri, S.C. and Anyaeche, C.O. (2014). An Investigation of Time-Cost-Risk Trade-off in the Installation of X-ray Machine, Nigerian Journal of Technology 33(4):482 –489.