OPTIMIZATION OF WASTE MANAGEMENT PLAN FOR WASTE REDUCTION ON CONSTRUCTION PROJECTS IN NIGERIA

dc.contributor.authorOladiran O.J.
dc.date.accessioned2024-04-30T18:03:01Z
dc.date.available2024-04-30T18:03:01Z
dc.date.issued2008
dc.description.abstractSeveral millions of tonnes of waste are generated in the construction industry annually. This rate is alarming because it is in multiples of household waste production. Construction industry gives less concern to waste reduction due to the complex nature of reuse and recycling which is a top priority in curbing waste generation. Effective implementation of waste management plan (WMP) is a major means of reducing waste on construction projects. A waste management plan represent waste issues on the map and identification of existing waste problems is of top priority; it then pinpoint the volume of waste for reduction, salvage, reuse or recycling. This study focuses on the use of waste management plan at construction sites in Nigeria. A survey was conducted on a sample of construction companies in Nigeria using convenience-sampling technique. In the paper, the most important factors that underlie effective implementation of WMP is staff training and it reveals ten items that should form the content of a good WMP. The paper suggests that practitioners should be cognizant of the factors discover in this research for implementing WMP and to ensure that WMP consist all the contents identified in the study to reduce waste on construction projects.
dc.identifier.citation1. Oladiran, O.J. (2008). Optimization of waste management plan for waste reduction on construction projects in Nigeria. Proceedings: International conference on innovation in Architecture, Engineering and construction, June 23-25, Antalya, Turkey.
dc.identifier.urihttps://ir.unilag.edu.ng/handle/123456789/12829
dc.language.isoen
dc.publisherProceedings: International conference on innovation in Architecture, Engineering and construction, Antalya, Turkey.
dc.titleOPTIMIZATION OF WASTE MANAGEMENT PLAN FOR WASTE REDUCTION ON CONSTRUCTION PROJECTS IN NIGERIA
dc.typeArticle
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
AEC2008-02-Optimization of Waste Management Plan for Waste R.pdf
Size:
160.53 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: